Menu Close

We have completed the construction work related to the building of the Primary School at Podbórzańska and Kredowa streets in Szczecin

The investment commissioned by the Municipality of the City of Szczecin included a wide range of construction and installation works aimed at creating a modern educational space.

As part of the project, we accomplished: ▪ Completion of structural and construction works, including the steel structure of the sports hall roof. ▪ Construction of the auditorium roof made of glued laminated timber and installation of aluminum windows and doors. ▪ Roofing with PVC membrane and façade finishing using light-wet technology and ventilated façade. ▪ Comprehensive interior finishing works, including the installation of suspended ceilings and wall claddings. ▪ Sanitary and electrical installations, along with fire alarm systems, ventilation, and air conditioning. ▪ Site development, including the construction of sports fields, tracks, playgrounds, roads, sidewalks, and parking lots.

A few numbers: ▪ Building footprint: 5762 m² ▪ Usable floor area: 12,017.66 m² ▪ Total area of external spaces: 34,872.03 m², including: ▪ Sports fields and tracks: 3,013.78 m² ▪ Playgrounds and outdoor gym: 792.92 m²

The investment was carried out by the Leszno Branch. We wish you fruitful learning in the new school walls.

Photos: Michał Sadecki