From the Unilin construction site in Krasowa – a progress report!
Our Łódź branch of Adamietz S.A. is intensively carrying out an ambitious investment: the construction of an insulation board factory. Over 35,000 m² of modern covered space is being built on a plot with a total area of 122,706 m². The scale of the project is impressive, and the works are progressing according to schedule.
What stage has the project reached?
Structure: The reinforced concrete prefabricated structure supplied by PREFAR is complete. Approximately 80% of the steel structure, supplied and assembled by #FORMOPEX, has already been installed.
Cladding: Around 5,300 m² of #ARPANEL sandwich panels have already been installed on the façade.
Roofing: The insulation of the warehouse roof (including smoke vents) is 95% complete. Today we are commencing the installation of roof insulation over the production hall. Naturally, for all insulation works we use Unilin’s high-performance PIR insulation boards.
Office and technical buildings: Installation of hollow-core slabs on the office buildings is underway, along with brickwork for the technical rooms inside the hall.
Foundations: We are completing the concreting of the foundation slab beneath the tank farm.
Installations: In parallel, we are carrying out advanced works on the storm drainage system, sprinkler installation, electrical systems, and roof drainage.
The investment encompasses a warehouse, production hall, canopies, and office buildings. In total, over 35,000 m² of modern covered space will be delivered.
Congratulations to the team from the Łódź Branch for the efficient management of such a complex process!

UNILIN in Krasowa – Construction Progress Update