Menu Close

Combining modern design with functionality

Our latest project is located in the strategic Metalchem zone at ul. Oświęcimska in Opole, where functionality meets modern design.

✅ We will design and build a warehouse with a usable area of approximately 1,500 m2, equipped with two overhead cranes with a total lifting capacity of 120 tonnes, ready for the handling of the oversized items of major importance for DB-PRO Sp. z o.o. But there’s more! Harmoniously located nearby the warehouse, the client’s 575 m2 three-storey office building is also part of the works.

The building plans and specifications, as well as detailed plans for the construction were prepared by our integrated design engineering studio.
The conceptual design corresponds with the colours of the client’s logo, creating a coherent and aesthetically pleasing whole. ➡ It is a challenge that combines rigorous technical requirements with creativity and innovation, without forgetting the constraints like the proximity of high-voltage lines and the regulations of the local development plan, to name a few.

At Adamietz, we do not take shortcuts. 💪 Our experience and commitment to every detail ensure that we not only achieve the objectives of each project, but also inspire and enrich the urban fabric to make our work an integral part of the cityscape.

Privacy Overview
Favicon, logo Adamietz

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Marketing

This website uses the following additional cookies:

(List the cookies that you are using on the website here.)